Byrne Manufacturing

Showing: Posts

Filter Posts

Diesel Progress Goes Trenchless

In August of 2023 the Michael Byrne Mfg. D72-1.5M Auger Boring machine was called into action on the California Coast to alleviate HWY 1 washouts from the spring season storms.  Pacific Boring, located in Caruthers, California, was awarded the bid for this emergency job in Santa Barbara County.  The job required 140 ft. of 60″…


Auger Boring in Big Sur

Pacific Boring used a Michael Byrne D72-1.5 for a CALTRANS drainage project going under Highway 1 in the Big Sur, California. See the article below for full details of this 60″ diameter, 200ft bore. Auger Boring in Big Sur – Trenchless Technology


Michael Byrne Mfg. expands Canadian Network with Sub-Surface

Michael Byrne Manufacturing announces the addition of Sub-Surface Equipment and Mike Shannon to represent MBM products in Western Canada.  Mike has extensive background in the underground utility construction market with over 20 years providing equipment and tooling solutions to contractors.  Michael Byrne Mfg. continues to supply parts factory direct to contractors, ensuring the fastest turn…


Pipelines Are The Safest Delivery Method

The delivery of Natural Gas via pipelines continues to be the most cost effective and safest delivery method. Studies continue to verify pipelines as the safest and most environmentally safe delivery method  https://www.aga.org/research/fact-sheets/pipeline-safety/.  The export of LNG has recently made the United States the number one exporter of LNG.  The export of LNG strengthens the…